Education
| Purdue University |
Ph.D. Construction Engineering and Management |
1989 |
| University of Michigan |
MBA Management |
1981 |
| Pennsylvania State University |
B.S. Civil Engineering |
1975 |
Academic Employment History
| 1994-present |
Purdue University, West Lafayette, Indiana. Associate Professor of Building Construction Management, College of Technology |
| 1989-1994 |
Purdue University, West Lafayette, Indiana. Assistant Professor of Building Construction Management, College of Technology |
Industry Employment/Consultant Activities
| 1981-1984 |
Bechtel Corporation, Ann Arbor, Michigan, Senior Planning Engineer: Scheduled the design and construction of a $1.6 billion power plant. |
| 1979-1979 |
Foster Wheeler Corporation, Elbistan, Turkey, Chief Planning Engineer: Managed the field-planning department for power plant construction. |
| 1978-1979 |
Foster Wheeler Corporation, Shedgum, Saudi Arabia Senior Planning Engineer: Scheduled the construction of a natural gas plant. |
| 1975-1978 |
Badger Inc., Cambridge, Massachusetts, Ashland, Kentucky and Texas City, Texas, Construction Engineer: Various responsibilities required for the construction of process plants. |
| 1990 - present |
Shuck Corporation, Indianapolis, Indiana, project management and estimating consultant. |
Presentations, Workshops, and Seminars
- “Progress Monitoring,” AACE Annual Meeting, Portland, Oregon, June 25, 2002
- “Change Management Control Methods,” Southwestern Ohio Section of AACE, Cincinnati, Ohio, May 21, 2002
- “Skills & Knowledge Required for Future Leaders,” AACE Annual Meeting, Pittsburgh, Pennsylvania, June 20, 2001
- “Controlling Commodity Installation Activities,” AACE Annual Meeting, Pittsburgh, Pennsylvania, June 19, 2001
- “Construction Contracts – Changes,” AACE Annual Meeting, Pittsburgh, Pennsylvania, June 20, 2001
- “How do You Get the Most Out of Your Advisory Board: As an Educator and as a Constructor?” AGC of Indiana Educators and Constructors Conference, Terre Haute, Indiana, September 29, 2000
- “Analyzing Construction Productivity,” a two-hour presentation, Joint Cost Management Societies, November 10, 1999, Chicago, Illinois.
- "Construction Labor Cost Reporting," a two hour presentation, Annual Meeting of Association for the Advancement of Cost Engineering, Denver, Colorado, June 29, 1999.
- "Labor Cost Control," a two hour presentation, Annual Meeting of Association for the Advancement of Cost Engineering, Cincinnati, Ohio, July 1, 1998.
- "Planning and Scheduling," a half hour presentation, International Construction Cost Management Seminar, Warsaw, Poland, April 24, 1998.
- "Labor Cost Control," a two hour presentation, Annual Meeting of Association for the Advancement of Cost Engineering, Dallas, Texas, July 16, 1997.
- “Building Project Control,” Advanced Project Management and Dynamic Project Execution Conference for Engineering Management, Costa Mesa, California, July 10, 1996.
- "Progress and Cost Control," a two hour presentation, Annual Meeting of Association for the Advancement of Cost Engineering, St. Louis, Missouri, June 27, 1995.
- “Keys of Construction Management,” Advanced Construction Management Conference for Engineering Management, Costa Mesa, California, September 26, 1994.
- "Progress and Cost Control," a two hour presentation, Annual Meeting of Association for the Advancement of Cost Engineering, San Francisco, California, June 21, 1994.
- "Progress and Cost Control," a two-hour presentation, Annual Meeting of Association for the Advancement of Cost Engineering, Dearborn, Michigan, July 1993.
- "Progress and Cost Control," a three-hour presentation, Annual Meeting of Association for the Advancement of Cost Engineering, Orlando, Florida, June, 1992
- “Managing Change on the Project,” September 23, 1999, January 21, 2000, May 3, 2000, October 26, 2001, February 1, 2001, May 16, 2001, November 8, 2001 IEC/ABC
- “Get Ahead & Stay Ahead -- Frontloading,” September 25, 1999, January 22, 2000, May 6, 2000, October 28, 2000, February 3, 2001, May 16, 2001, November 10, 2001 IEC/ABC
- “Material cost Control and Subcontract Cost Control,” November 7, 2001 IEC/ABC
- “Keeping Score – Labor Costs and You,” September 25, 1999, January 22, 2000, May 6, 2000 October 28, 2000, February 3, 2001, and May 16, 2001, IEC/ABC
- “The River of Life – Cash Flow,” November 18, 1999, April 7, 2000, August 17, 2000, January 18, 2001, April 19, 2001, August 17, 2001, January 30, 2002 IEC/ABC
- “Short Interval Scheduling,” November 18, 1999, April 7, 2000, August 17, 2000, and January 18, 2001 IEC/ABC
- “Keeping Score – Tracking and Logging,” November 17, 1999, April 5, 2000, August 16, 2000, January 17, 2001, April 19, 2001, August 16, 2001 IEC/ABC
- “Contract –Delays, Accelerations, Changes-in-Scope, and Differing Site Conditions,” November 12, 1998 PHCC
- “Schedule of Values,” November 13, 1998 PHCC
- “Labor Cost Reporting,” November 14, 1998 PHCC
- “Forecasting and Managing Cash Flow,” February 25, 1998 PHCC
- “Tracking Costs and Project Logs,” February 25, 1998 PHCC
- “Short Interval Scheduling,” February 26, 1998 PHCC
- "Scheduling Course of the Graduate Builders Series," six hours for the Home Builders Association of St. Louis, 1997, St. Louis, Missouri
- "Scheduling Course of the Graduate Builders Series," six hours for the Home Builders Association of Northern Kentucky, 1996, Fort Mitchell, Kentucky
- "Estimating Course of the Graduate Builders Series," six hours for the Home Builders Association of Northern Kentucky, June 8, 1996, Fort Mitchell, Kentucky
- "Scheduling Course of the Graduate Builders Series," six hours for the Home Builders Association of Kentucky, 1996, 1995, 1994, 1993, 1992, 1991, 1990, and 1989, Louisville, Kentucky
- "Estimating Course of the Graduate Builders Series," six hours for the Home Builders Association of Kentucky, 1995, 1994, 1993, 1992, 1991, 1990, 1989, and 1988, Lexington, Kentucky
- "CPM Scheduling," four hours for the Wilson-Blazek Corporation, Indianapolis, 1990
- "Construction Project Management Case Study," four hours for the Indianapolis Department of Public Works, Indianapolis, 1990
- "Construction Cost Control for the Owner," four hours for the Indianapolis Department of Public Works, Indianapolis, 1990
- "Estimating Course of the Graduate Builders Series," six hours for the Home Builders Association of Tennessee, Knoxville, Tennessee, 1990
Publications
Refereed / Peer Reviewed:
- Orczyk*, J. J. & Chang, L. M. (1991). Parametric regression model for project scheduling. Project Management Journal, 24(4), 41-47.
- Jenkins*, J. L., Kramer, S. W., & Orczyk, J. J. (2006). Scheduling 101: A behind-the-scenes look at basic schedule calculations. Proceedings of the Project Management Institute College of Scheduling, Orlando, FL [CD: paper number 5.1, 17 pages].
Non-refereed / Trade Publications / Reports:
- Orczyk, J. J. (1999). Interruptible or Continuous Activity Durations? Proceedings of the 43rd Annual Meeting of AACE International, CDR.08.1 – CDR.08.4.
- Orczyk, J. J. (1993). Subcontractor management for public buildings. Proceedings of the 37th Annual Meeting of AACE International, G.7.1-G.7.7.
- Orczyk, J. J. (1991). Construction management reporting. Proceedings of the 35th Annual Meeting of American Association of Cost Engineers, SK.5.1-SK.5.6.
- Orczyk*, J. J. & Chang, L. M. (1990). Parametric project scheduling of milestones. Proceedings of the 34th Annual Meeting of American Association of Cost Engineers, M.4.1-M.4.11.
- Orczyk, J. J. (1990). Construction labor variance analysis teaching model. Proceedings of the 26th Annual Conference of the Associated Schools of Construction, 95-99.
- Orczyk, J. J. (1989). Variance analysis labor cost report. Proceedings of the 33rd Annual Meeting of American Association of Cost Engineers, F.2.1.-F.2.4.
- Baha*, Z. & Orczyk, J. J. (1987). Computers and construction. Proceedings of the 13th Annual Conference of the Association of Muslim Scientists and Engineers, 16, 36-42.
- Orczyk*, J. J. & Hancher, D. (1987). Schedule risk analysis using computer simulation. Proceedings of the 31st Annual Meeting of American Association of Cost Engineers, A.7.1-A.7.6.
Book Chapters:
- Orczyk, J. J., (2004). Chapter 14 – Progress Measurement & Earned Value, Chapter 15 – Earned value for Variable Budgets, Chapter 16 – Tracking Cost & Schedule Performance, and Chapter 21 – Project Labor Cost Control. In Skills and Knowledge of Cost Engineering, 5th Edition, SCoTt Amos, PE, Editor, AACE International, 2004 ISBN 1-885517-49-1
- Orczyk, J. J. (1997). Controlling the Cost of Construction Labor. Westney, Richard E. (Ed.), The Engineers Cost Handbook. New York, NY: Marcel Dekker, Inc..
- Orczyk, J. J., Neil*, J. M., & Rahbar, F. (1992). Progress and cost control I. In D. F. McDonald & J. M. Neil (Eds.), Skills & knowledge of cost engineering (pp. 9.1-9.6). Morgantown, WV: Association for the Advancement of Cost Engineering.
|